MRT...Dimulai!!

Forum untuk mengobrol hal-hal bebas.
Bisa dibuka oleh visitor dan member.

Moderators: Ryan Steele, sh00t, r12qiSonH4ji, avantgardebronze, akbarfit

User avatar
dubz
New Member of Mechanic Engineer
New Member of Mechanic Engineer
Posts: 805
Joined: Sat May 11, 2013 2:07

MRT...Dimulai!!

Post by dubz »

Image

http://www.thejakartapost.com/news/2013 ... akpro.html
http://www.thejakartapost.com/news/2013 ... leted.html
The much-awaited mass rapid transit (MRT) project is set to kick off next month as the project tenders for elevated civil works have been completed.

City-owned project operator PT MRT Jakarta has announced that a consortium of Japanese and Indonesian companies — Tokyu-WIKA and Obayashi-Shimizu-Jaya Konstruksi — are the winners of three elevated civil work packages worth a total of ¥35 billion (US$353.21 million).

Consortium Tokyu-WIKA has won two construction packages, worth ¥15 billion and ¥10 billion respectively, while Obayashi-Shimizu-Jaya Konstruksi won one package worth ¥10 billion.

The contracts will expire within 243 weeks.

MRT Jakarta president director Dono Boestami said that the completion of the tenders for the elevated civil works marked the immense progress made by the company.

“The tender process was a vital phase in the project. With the completion of the tenders, we are upbeat that the MRT project will be realized,” Dono said in a press statement made available to The Jakarta Post on Monday.

Previously, Dono said that the MRT’s construction would be launched in Dukuh Atas in Central Jakarta in October.

The MRT construction project is divided into eight packages, comprising three underground civil works, three elevated civil works, the MRT system and MRT rolling stock.

Earlier this year, Dono and Governor Joko “Jokowi” Widodo announced the winners of three underground work packages: consortium

Shimizu-Obayashi-Wijaya Karya-Jaya Konstruksi, which will carry out two underground construction packages, and consortium Sumitomo Mitsui Construction Company-Hutama Karya.

MRT Jakarta is currently evaluating the pre-qualification documents submitted by the tender participants bidding on the remaining MRT system and MRT rolling stock packages.

The construction of the first phase of the MRT track will be funded by a ¥125 billion soft loan from the Japan International Cooperation Agency (JICA).

The central government has agreed to repay 49 percent of the loan, while the administration will pay the rest over a loan period of 40 years, with a grace period of 10 years and at an interest rate of below 1 percent per year.

The track will have six underground stations, seven elevated stations and capacity for up to 173,000 passengers per day. The first phase of work requires Rp 3.6 trillion in funding.

The first phase of the MRT track, which will connect Lebak Bulus in South Jakarta and the Hotel Indonesia traffic circle, is expected to be ready by 2017.
User avatar
dubz
New Member of Mechanic Engineer
New Member of Mechanic Engineer
Posts: 805
Joined: Sat May 11, 2013 2:07

Re: MRT...Dimulai!!

Post by dubz »

Image

Phase I
=======
The first phase is 15.7 kilometres (9.8 mi) long from Lebak Bulus to Bundaran HI. The construction project will begin in June 2011 and is expected to be completed in 2016 to serve 212,000 passengers per day. This expected capacity may be maxed out to 960,000 per day. The 15.7 kilometers span expected to be covered in under 30 minutes.[6]

Elevated stations

Lebak Bulus
Fatmawati
Cipete
Haji Nawi
Blok A
Blok M
Sisingamangaraja

Underground stations

Al-Azhar mosque
Senayan
Bendungan Hilir
Setiabudi
Dukuh Atas (Interchange Station with Jakarta Commuter Line)
Bundaran H.I
User avatar
an15wn
Full Member of Senior Mechanic
Full Member of Senior Mechanic
Posts: 467
Joined: Fri Aug 15, 2008 23:31
Location: Jakarta Timur

Re: MRT...Dimulai!!

Post by an15wn »

The construction project will begin in June 2011 and is expected to be completed in 2016
Wah, kok gak ada tanda2 konstruksi lalo emang dimulai dari 2011? Skrg kan dah ujung th 2013. Gak bakalan jadi tuh 2016. Keburu mobil murah memenuhi jalanan.
User avatar
doq
New Member of Mechanic Master
New Member of Mechanic Master
Posts: 9498
Joined: Sat May 10, 2008 12:09
Location: jkt-bdg-jkt-bdg definitely

Re: MRT...Dimulai!!

Post by doq »

sip lah sdh dimulai :frm_tumbleft:
mudah2an ga bakal stuck di tengaj proyek macam pengerjaan flyover tn.abang-casablanca :e-think:
Lets behave ourself
NO tolerance on SARA, Personal issue, Spam
WE are watching
Image

Click here to call Moderator
User avatar
evolution21
Full Member of Mechanic Engineer
Full Member of Mechanic Engineer
Posts: 5885
Joined: Thu Aug 28, 2008 10:32

Re: MRT...Dimulai!!

Post by evolution21 »

ah palingan ntar stuck tengah jalan, trus gonjang ganjing korup diselidiki proyek mrt oleh kpk
User avatar
andy1800
New Member of Mechanic Master
New Member of Mechanic Master
Posts: 8285
Joined: Mon Mar 24, 2008 19:52
Location: djakarta

Re: MRT...Dimulai!!

Post by andy1800 »

pd dasarnya, bagus..tentu tdk akan lsg sempurna. Tp selangkah demi selangkah ke depan, itu bagaimanapun adlh hal yg bagus.


Satu kekhawatiran mendasar ane, kayaknya gak ada yg mikirin ya, bhw sebenernya utk kondisi jabotabek ini, adlh wajib dibuatkan kantong2 parkir raksasa yg terintegrasi...terutama di ujung2 luar stasiun/suburbs.
LAJUR KANAN... HARAP DISTERILKAN!

Image
User avatar
dubz
New Member of Mechanic Engineer
New Member of Mechanic Engineer
Posts: 805
Joined: Sat May 11, 2013 2:07

Re: MRT...Dimulai!!

Post by dubz »

an15wn wrote:
The construction project will begin in June 2011 and is expected to be completed in 2016
Wah, kok gak ada tanda2 konstruksi lalo emang dimulai dari 2011? Skrg kan dah ujung th 2013. Gak bakalan jadi tuh 2016. Keburu mobil murah memenuhi jalanan.
itu ngaco copy pastean dari wiki om sorry...mulainya konstruksi baru thn ini
User avatar
dubz
New Member of Mechanic Engineer
New Member of Mechanic Engineer
Posts: 805
Joined: Sat May 11, 2013 2:07

Re: MRT...Dimulai!!

Post by dubz »

Om andy...kayanya si ahok pernah bilang mau ada lahan parkirnya..lupa baca dimana. Memang ribet kalo mesti naik angkot dari rumah....paling efisien naik mobil sampe parkiran trus naik mrt.
User avatar
VanzMatic
New Member of Mechanic Master
New Member of Mechanic Master
Posts: 11277
Joined: Sat Nov 27, 2010 1:07
Location: Yogya Is Timewa

Re: MRT...Dimulai!!

Post by VanzMatic »

andy1800 wrote:pd dasarnya, bagus..tentu tdk akan lsg sempurna. Tp selangkah demi selangkah ke depan, itu bagaimanapun adlh hal yg bagus.


Satu kekhawatiran mendasar ane, kayaknya gak ada yg mikirin ya, bhw sebenernya utk kondisi jabotabek ini, adlh wajib dibuatkan kantong2 parkir raksasa yg terintegrasi...terutama di ujung2 luar stasiun/suburbs.
Itu harusnya juga ada. Di setiap halte busway maupun station harusnya sudah tersedia kantong kantong parker.
Kenapa harus raksasa dalam artian areal luas?

Kalok mall aja bias sediakan parkiran vertical, kenapa stasiun maupun halte ngga bisa? Bukannya ngga bisa, itu hanya ngga mau aja paling....

Tapi mudahan segera ada ya lahan parkir yang mumpuni...
:big_blushing:
" It is not the eyes that are blind, but the hearts "
User avatar
Jambangan
Member of Mechanic Engineer
Member of Mechanic Engineer
Posts: 2733
Joined: Wed Feb 08, 2012 11:57
Location: Bekasi
Daily Vehicle: 2021 Yamaha XSR

Re: MRT...Dimulai!!

Post by Jambangan »

Ane setuju ama om andy. Sebaiknya dibikin parkiran di dekat stasiun2 MRT nya
Ane berharap di stasiun2 kereta jg dibikin gedung parkir yg bisa menampung banyak mobil
Ane sekarang kalo naik commuter line dari kampus ke bekasi agak ribet kendarannya di stasiun bekasi. Harus gonta ganti angkot 3 kali dari stasiun bekasi ke perumahan ane
Ya sebenernya ga terlalu masalah sih tapi lebih enak kalo ada gedung parkir yg aman jadi bisa nitip mobil disitu hehe..
User avatar
dubz
New Member of Mechanic Engineer
New Member of Mechanic Engineer
Posts: 805
Joined: Sat May 11, 2013 2:07

Re: MRT...Dimulai!!

Post by dubz »

Saya rasa pengguna mobil gak terlalu susah pindah ke mrt...soalnya costnya pasti beda banget duit dan waktu. Nah sepeda motor, kayanya gak beda jauh duitnya..langsung sampe rumah pula.
User avatar
an15wn
Full Member of Senior Mechanic
Full Member of Senior Mechanic
Posts: 467
Joined: Fri Aug 15, 2008 23:31
Location: Jakarta Timur

Re: MRT...Dimulai!!

Post by an15wn »

dubz wrote:
an15wn wrote:
The construction project will begin in June 2011 and is expected to be completed in 2016
Wah, kok gak ada tanda2 konstruksi lalo emang dimulai dari 2011? Skrg kan dah ujung th 2013. Gak bakalan jadi tuh 2016. Keburu mobil murah memenuhi jalanan.
itu ngaco copy pastean dari wiki om sorry...mulainya konstruksi baru thn ini
Lalu, jadinya kapan, donk? :( Makin mundur aja nih...

Pengen juga sih punya moda transportasi terpadu spt di negara2 lain. Wong Malaysia aja dgn satu tiket dah bisa dipake utk naik bus nyambung mrt, kok.

Moga2 pemda sadar bahwa modal bikin moda transportasi umum sepadan dgn yg didapatkan, lah. Ketimbang buang2 duit utk mbangun jalan layang non toll dlm kota macam Antasari dan Casablanca.
User avatar
evolution21
Full Member of Mechanic Engineer
Full Member of Mechanic Engineer
Posts: 5885
Joined: Thu Aug 28, 2008 10:32

Re: MRT...Dimulai!!

Post by evolution21 »

iya bagus sih um andy
cuman ane dah cape banget liat pejabat di negri ini
kayanya tiap kali muncul ide bagus langsung hopeless aja bawaannya
User avatar
andy1800
New Member of Mechanic Master
New Member of Mechanic Master
Posts: 8285
Joined: Mon Mar 24, 2008 19:52
Location: djakarta

Re: MRT...Dimulai!!

Post by andy1800 »

Hahhaa paham om evo...bs dimengerti.


Om dubz, ki lurah VM, jambangan:
Oh cak ahok dah bilang gitu ya.. naa, sip2 klo gitu.

Ya maksudnya giant/raksasa tu bs macam cara, ki VM. masa konotasinya cm parkir horizontal doang? Ya gak laah. Intinya mampu tampung buanyak sekali.

Tul, mmg utk kondisi sini tetep perlu kendraan pribadi utk mncapai stasiun...tentu tiap stasiun perlu lahan parkir, tp tentu parkir yg perlu giant tu stasiun2 yg cenderung di suburbs.





.....
Diluar itu, msh ada mimpi ane yg lbh jauh lagi pd perkmbangnnya nanti, bs juga kawasan2 sudirman senayan kuningan gatsu gitu bs saja dibikin mnjadi kawasan tanpa mobil, dg dibikin satu giant parking lot, misalnya di ScBD atau senayan atau
manalah. Tentu saja parkir di zona itu jauh lbh mahal drpd di stasiun ujung MRT (klo parkir MRT dibikin murah sekali, integrated dg tiket MRT nya)...trus disediakan shuttle (usahakan se-green mgkin) yg gratis, yg jaringannya tepat, yg mengelilingi kawasan2 itu. Dg bgitu pasti kawasan itu akan jd nyaman buat jalan kaki.
Hohohooo mimpi...

Lanjut, lanjut...
LAJUR KANAN... HARAP DISTERILKAN!

Image
User avatar
VanzMatic
New Member of Mechanic Master
New Member of Mechanic Master
Posts: 11277
Joined: Sat Nov 27, 2010 1:07
Location: Yogya Is Timewa

Re: MRT...Dimulai!!

Post by VanzMatic »

Sedikit melenceng dari topic, tapi masih ada kaitan dengan transpor publik..
2 bulan ini ane ditugasin di store di bilangan cipinang-jatinegara.
Kalau pakai motor, ongkos 22.000 (bbm+aditif untuk 1 tangki motor bebek) habis dalam 9 hari. Pengendaraan
campuran. Betot iya, santai juga iya. Pengeluaran per 9 hari untuk transport ane segitu.Berarti sebulan (24 hari kerja) akan keluar Rp 58.667. Pembulatan 60 ribu lah.

Kalau pakai busway, ane belum hitung ongkos bbm nya jadi 12 hari atau 15 hari, belum tau.
Tapi sebagai gambaran, kalau ane naik dari halte busway buaran, turun di jatinegara, 1 trip 3.500. Kalo pp berarti 7.000 sehari. Kalo 9 hari berarti 63.000. Sebulan (24 hari kerja) = Rp 168.000.

Itu baru ongkos busway loh.. Belum ongkos titip parkir seharian di bioskop buaran taruh kata 3.000 deh, nanti coba ane survey lagi.., belum lagi bbm motor yg mungkin konsumsinya menurun .. say it separuh, sekira 12 ribu selama 9 hari.

Coba dicoret2...
Ongkos parkir 3.000x24 hari = Rp 72.000,-
BBM selama 24 hari = Rp 32.000,-
Berarti, ongkos diluar busway= Rp 104.000,-

Ongkos busway sebulan.. Rp 168.000 --> Sebulan kudu keluar kocek transport Rp 168.000 + Rp 104.000,- = Rp 272.000,-

Bandingkan dengan kalau saya naik motor saja, hanya keluar Rp 60.000.

Hemat 77,8% sendiri.

Nah kalo begini caranya, bagaimana mau mendorong transport publik?
:big_blushing:

Saya belum nyoba kalau saya ditugasin ke cabang Salemba atau Tipar, akan habis berapa..mungkin ada teman2 mau membantu? Buat kalkulasi, apa bener kalau pakai transport publik itu semakin jauh semakin murah?



Duluu jaman masih di Tangsel, kerja di thamrin, sehari akan habis biaya angkutan:
1. Berangkat:
- angkot ke stasiun 2000
- kereta bumel alias campur ayam dan sayur dan buah, 2500
- naik kopaja dari tenabang ke depag dan jalan kaki ke kantor, berapa yak...agak lupa... sekira 3000.
Berarti berangkatnya udah 7.500.

2. Pulang, sami mawon. kopaja ke tenabang, kereta bumel, dan angkot. 7500 lagi. Kalau ga kebagian bumel, terpaksa naik KRL ac non patas, waktu itu 5000. Berarti 10.000 total pulangnya.
Sehari sekira 15.000 - 17.500.

Sementara kalau naik motor, dulu masih 4.500/liter premium. PP 72km hanya habis 1,25 liter. Style santai buat ngejar irit. Kalo dirupiahin, sekira 6.000 rupiah doang PP sehari.

Nah... Bagaimana mendorong masyarakat pindah ke transpor publik kalo selisihnya jauh banget begini?
:big_blushing:

BTT
" It is not the eyes that are blind, but the hearts "
mbah_sby
Member of Senior Mechanic
Member of Senior Mechanic
Posts: 289
Joined: Tue Jun 04, 2013 4:50

Re: MRT...Dimulai!!

Post by mbah_sby »

andy1800 wrote:Hahhaa paham om evo...bs dimengerti.


Om dubz, ki lurah VM, jambangan:
Oh cak ahok dah bilang gitu ya.. naa, sip2 klo gitu.

Ya maksudnya giant/raksasa tu bs macam cara, ki VM. masa konotasinya cm parkir horizontal doang? Ya gak laah. Intinya mampu tampung buanyak sekali.

Tul, mmg utk kondisi sini tetep perlu kendraan pribadi utk mncapai stasiun...tentu tiap stasiun perlu lahan parkir, tp tentu parkir yg perlu giant tu stasiun2 yg cenderung di suburbs.





.....
Diluar itu, msh ada mimpi ane yg lbh jauh lagi pd perkmbangnnya nanti, bs juga kawasan2 sudirman senayan kuningan gatsu gitu bs saja dibikin mnjadi kawasan tanpa mobil, dg dibikin satu giant parking lot, misalnya di ScBD atau senayan atau
manalah. Tentu saja parkir di zona itu jauh lbh mahal drpd di stasiun ujung MRT (klo parkir MRT dibikin murah sekali, integrated dg tiket MRT nya)...trus disediakan shuttle (usahakan se-green mgkin) yg gratis, yg jaringannya tepat, yg mengelilingi kawasan2 itu. Dg bgitu pasti kawasan itu akan jd nyaman buat jalan kaki.
Hohohooo mimpi...

Lanjut, lanjut...

setuja dengan yg ini..great idea!!
tapi kalo soal konstruksi bangunannya bagaimana ya? kan jakarta ini udah terlanjur penuh dengan gedung2 tinggi yg parkiran nya juga sampe di bawah bertingkat2? sampe kedalaman tanah brapa meter konstruksinya aman, baik aman bagi bangunan baru MRT dan aman bagi bangunan lama yg ada di atasnya?
ada yg pakar konstruksi di sini?
User avatar
artoodetoo
Full Member of Mechanic Engineer
Full Member of Mechanic Engineer
Posts: 6014
Joined: Sun Aug 26, 2007 3:43

Re: MRT...Dimulai!!

Post by artoodetoo »

Wah, kalo di Jogja apa ya memungkinkan ya dibikin MRT? :e-think: :shrug:
Monggo mampir ke blog saya http://yahyakurniawan.net
User avatar
ecco
New Member of Mechanic Engineer
New Member of Mechanic Engineer
Posts: 960
Joined: Wed Aug 14, 2013 13:07

Re: MRT...Dimulai!!

Post by ecco »

VanzMatic wrote:Sedikit melenceng dari topic, tapi masih ada kaitan dengan transpor publik..
2 bulan ini ane ditugasin di store di bilangan cipinang-jatinegara.
Kalau pakai motor, ongkos 22.000 (bbm+aditif untuk 1 tangki motor bebek) habis dalam 9 hari. Pengendaraan
campuran. Betot iya, santai juga iya. Pengeluaran per 9 hari untuk transport ane segitu.Berarti sebulan (24 hari kerja) akan keluar Rp 58.667. Pembulatan 60 ribu lah.

Kalau pakai busway, ane belum hitung ongkos bbm nya jadi 12 hari atau 15 hari, belum tau.
Tapi sebagai gambaran, kalau ane naik dari halte busway buaran, turun di jatinegara, 1 trip 3.500. Kalo pp berarti 7.000 sehari. Kalo 9 hari berarti 63.000. Sebulan (24 hari kerja) = Rp 168.000.

Itu baru ongkos busway loh.. Belum ongkos titip parkir seharian di bioskop buaran taruh kata 3.000 deh, nanti coba ane survey lagi.., belum lagi bbm motor yg mungkin konsumsinya menurun .. say it separuh, sekira 12 ribu selama 9 hari.

Coba dicoret2...
Ongkos parkir 3.000x24 hari = Rp 72.000,-
BBM selama 24 hari = Rp 32.000,-
Berarti, ongkos diluar busway= Rp 104.000,-

Ongkos busway sebulan.. Rp 168.000 --> Sebulan kudu keluar kocek transport Rp 168.000 + Rp 104.000,- = Rp 272.000,-

Bandingkan dengan kalau saya naik motor saja, hanya keluar Rp 60.000.

Hemat 77,8% sendiri.

Nah kalo begini caranya, bagaimana mau mendorong transport publik?
:big_blushing:

Saya belum nyoba kalau saya ditugasin ke cabang Salemba atau Tipar, akan habis berapa..mungkin ada teman2 mau membantu? Buat kalkulasi, apa bener kalau pakai transport publik itu semakin jauh semakin murah?



Duluu jaman masih di Tangsel, kerja di thamrin, sehari akan habis biaya angkutan:
1. Berangkat:
- angkot ke stasiun 2000
- kereta bumel alias campur ayam dan sayur dan buah, 2500
- naik kopaja dari tenabang ke depag dan jalan kaki ke kantor, berapa yak...agak lupa... sekira 3000.
Berarti berangkatnya udah 7.500.

2. Pulang, sami mawon. kopaja ke tenabang, kereta bumel, dan angkot. 7500 lagi. Kalau ga kebagian bumel, terpaksa naik KRL ac non patas, waktu itu 5000. Berarti 10.000 total pulangnya.
Sehari sekira 15.000 - 17.500.

Sementara kalau naik motor, dulu masih 4.500/liter premium. PP 72km hanya habis 1,25 liter. Style santai buat ngejar irit. Kalo dirupiahin, sekira 6.000 rupiah doang PP sehari.

Nah... Bagaimana mendorong masyarakat pindah ke transpor publik kalo selisihnya jauh banget begini?
:big_blushing:

BTT
Mantabs Om Vanz, kalau diliat dari coretan biaya di atas, ane setuju akan berat untuk mendorong masyarakat pindah ke transportasi publik dibanding bawa motor bebek. Mungkin kalau transportasi publik sudah benar2 nyaman - feeder kumplit, ujan tetep gak basah karena halte dan stasiun sudah mantabs, masyarakat mulai bisa mempertimbangkan dengan memasukan faktor kenyamanan (nggak cape bawa motor dan keujanan) sebagai nilai tambah naik transportasi publik.
IMO
Matikan HP/SmartP/BB/iPhone dalam pesawat, Gak usah sok penting - kalo penting nggak naik kelas Ekonomi
danan32
Full Member of Senior Mechanic
Full Member of Senior Mechanic
Posts: 382
Joined: Thu Jun 27, 2013 17:36

Re: MRT...Dimulai!!

Post by danan32 »

artoodetoo wrote:Wah, kalo di Jogja apa ya memungkinkan ya dibikin MRT? :e-think: :shrug:
Bisa jadi om,dari bandara baru(ni bandara jadi dibuat ga si?) ke tengah kota soalnya yogya dah mulai parah macetnya.
BejoSoMad
New Member of Senior Mechanic
New Member of Senior Mechanic
Posts: 173
Joined: Thu Sep 12, 2013 13:29

Re: MRT...Dimulai!!

Post by BejoSoMad »

wah mantab...
jadi kepingin poto ama

Image
kl udah dateng... :big_blushing:
andy1800 wrote: Diluar itu, msh ada mimpi ane yg lbh jauh lagi pd perkmbangnnya nanti, bs juga kawasan2 sudirman senayan kuningan gatsu gitu bs saja dibikin mnjadi kawasan tanpa mobil, dg dibikin satu giant parking lot, misalnya di ScBD atau senayan atau
manalah. Tentu saja parkir di zona itu jauh lbh mahal drpd di stasiun ujung MRT (klo parkir MRT dibikin murah sekali, integrated dg tiket MRT nya)...trus disediakan shuttle (usahakan se-green mgkin) yg gratis, yg jaringannya tepat, yg mengelilingi kawasan2 itu. Dg bgitu pasti kawasan itu akan jd nyaman buat jalan kaki.
Hohohooo mimpi...

Lanjut, lanjut...
mantab idenya pak andy...saya setuju...
VanzMatic wrote:Sedikit melenceng dari topic, tapi masih ada kaitan dengan transpor publik..
2 bulan ini ane ditugasin di store di bilangan cipinang-jatinegara.
Kalau pakai motor, ongkos 22.000 (bbm+aditif untuk 1 tangki motor bebek) habis dalam 9 hari. Pengendaraan
campuran. Betot iya, santai juga iya. Pengeluaran per 9 hari untuk transport ane segitu.Berarti sebulan (24 hari kerja) akan keluar Rp 58.667. Pembulatan 60 ribu lah.

Kalau pakai busway, ane belum hitung ongkos bbm nya jadi 12 hari atau 15 hari, belum tau.
Tapi sebagai gambaran, kalau ane naik dari halte busway buaran, turun di jatinegara, 1 trip 3.500. Kalo pp berarti 7.000 sehari. Kalo 9 hari berarti 63.000. Sebulan (24 hari kerja) = Rp 168.000.

Itu baru ongkos busway loh.. Belum ongkos titip parkir seharian di bioskop buaran taruh kata 3.000 deh, nanti coba ane survey lagi.., belum lagi bbm motor yg mungkin konsumsinya menurun .. say it separuh, sekira 12 ribu selama 9 hari.

Coba dicoret2...
Ongkos parkir 3.000x24 hari = Rp 72.000,-
BBM selama 24 hari = Rp 32.000,-
Berarti, ongkos diluar busway= Rp 104.000,-

Ongkos busway sebulan.. Rp 168.000 --> Sebulan kudu keluar kocek transport Rp 168.000 + Rp 104.000,- = Rp 272.000,-

Bandingkan dengan kalau saya naik motor saja, hanya keluar Rp 60.000.

Hemat 77,8% sendiri.

Nah kalo begini caranya, bagaimana mau mendorong transport publik?
:big_blushing:

Saya belum nyoba kalau saya ditugasin ke cabang Salemba atau Tipar, akan habis berapa..mungkin ada teman2 mau membantu? Buat kalkulasi, apa bener kalau pakai transport publik itu semakin jauh semakin murah?



Duluu jaman masih di Tangsel, kerja di thamrin, sehari akan habis biaya angkutan:
1. Berangkat:
- angkot ke stasiun 2000
- kereta bumel alias campur ayam dan sayur dan buah, 2500
- naik kopaja dari tenabang ke depag dan jalan kaki ke kantor, berapa yak...agak lupa... sekira 3000.
Berarti berangkatnya udah 7.500.

2. Pulang, sami mawon. kopaja ke tenabang, kereta bumel, dan angkot. 7500 lagi. Kalau ga kebagian bumel, terpaksa naik KRL ac non patas, waktu itu 5000. Berarti 10.000 total pulangnya.
Sehari sekira 15.000 - 17.500.

Sementara kalau naik motor, dulu masih 4.500/liter premium. PP 72km hanya habis 1,25 liter. Style santai buat ngejar irit. Kalo dirupiahin, sekira 6.000 rupiah doang PP sehari.

Nah... Bagaimana mendorong masyarakat pindah ke transpor publik kalo selisihnya jauh banget begini?
:big_blushing:

BTT
kl masalah selisih uang yg dikeluarkan menurut saya bisa diatasi...
saran pak andy di atas bisa di pakai...di larang aja masuk jalan yg udah ada jalur MRT ato yg angkutan umumnya udah memadai...atau juga masuk gratis tp kl mau parkir di hajar 100rebu...mst mikir... :big_biglaugh:
atau bisa juga di kenakan tarif untuk kendaraan2 yg mau masuk jalan2 tertentu yg sudah ada MRT ato yg angkutan umumnya udah standar internasional...

tp ini dengan asumsi fasilitas angkutan umum udah layak lho y dan masalah cm terletak di selisih biaya yg dikeluarkan...kl belum siap fasilitasnya y siap2 di demo aja... :big_biglaugh:
***** COOL VIDEOS !!! *****

http://www.globallabourrights.org/reports?id=0503

http://www.youtube.com/watch?v=V_BVB4kqp7Y

TOYOTA

The One You Ought To Avoid
User avatar
VanzMatic
New Member of Mechanic Master
New Member of Mechanic Master
Posts: 11277
Joined: Sat Nov 27, 2010 1:07
Location: Yogya Is Timewa

Re: MRT...Dimulai!!

Post by VanzMatic »

Iya om. Capek banget lah 72km pp naik motor. Belum kalo ujan, belum kalo kehadang banjir.
Tapi mo gimana lagi?
Selisih 9000-10.000 sehari lebih murah, orang ya milih buat dialokasiin bayar cicilan kredit motor lah.
Ini bicara kenyataan aja, ngga pake berandai andai kalo mass rapid udah rapih.
Itu mungkin bicara 5-6 taun ke depan.
nyicil 10.000 per hari, atau sekira 300ribu sebulan, itu udah masuk tenor kredit motor bebek berapa taun?
MRT belum kelar, cicilan kredit dah kelar.
:big_blushing:

Kt sebagai masy kecil kan taunya keadaan riil sekarang. Yang udah memadai itu dimana?

Atau, dibalik deh, yang punya mimpi bagus, saat ini, riil aja, mau gak ninggalin mobilnya, beralih ke angkot dan naik kereta yang jelas jelas bisa lebih murah dibanding ongkos naik mobil sehari...? Berapa persen yang mau kalau disebar random ke 100 orang pilihan begini?

Kalau rahayat jelata macam ane, jelas naik kendr pribadi macam motor, karena penghematan yang sangat signifikan.
Kalau rahayat SM selain ane, jelas naik mobil, karena kenyamanan yang sangat signifikan.

Iya apa iya?
:big_biglaugh:
" It is not the eyes that are blind, but the hearts "
User avatar
ecco
New Member of Mechanic Engineer
New Member of Mechanic Engineer
Posts: 960
Joined: Wed Aug 14, 2013 13:07

Re: MRT...Dimulai!!

Post by ecco »

ane kalo nguli nggak bawa mobil pribadi om...pakai transportasi umum...TAXI :ngacir:
Matikan HP/SmartP/BB/iPhone dalam pesawat, Gak usah sok penting - kalo penting nggak naik kelas Ekonomi
User avatar
VanzMatic
New Member of Mechanic Master
New Member of Mechanic Master
Posts: 11277
Joined: Sat Nov 27, 2010 1:07
Location: Yogya Is Timewa

Re: MRT...Dimulai!!

Post by VanzMatic »

ecco wrote:ane kalo nguli nggak bawa mobil pribadi om...pakai transportasi umum...TAXI :ngacir:
kuli beras serabutan supir truk macam ane hanya bisa ngecesss.....
:big_chicken:
" It is not the eyes that are blind, but the hearts "
User avatar
madfox18
New Member of Mechanic Engineer
New Member of Mechanic Engineer
Posts: 641
Joined: Wed Sep 11, 2013 4:50

Re: MRT...Dimulai!!

Post by madfox18 »

Syukur deh dimulai juga.
Teler bener gw naik taxi dijkrt.
Masa dari mta ke sudirman park kena 210 ribu. :big_slap:

SLOW BUT SURE
BejoSoMad
New Member of Senior Mechanic
New Member of Senior Mechanic
Posts: 173
Joined: Thu Sep 12, 2013 13:29

Re: MRT...Dimulai!!

Post by BejoSoMad »

VanzMatic wrote:Iya om. Capek banget lah 72km pp naik motor. Belum kalo ujan, belum kalo kehadang banjir.
Tapi mo gimana lagi?
Selisih 9000-10.000 sehari lebih murah, orang ya milih buat dialokasiin bayar cicilan kredit motor lah.
Ini bicara kenyataan aja, ngga pake berandai andai kalo mass rapid udah rapih.
Itu mungkin bicara 5-6 taun ke depan.
nyicil 10.000 per hari, atau sekira 300ribu sebulan, itu udah masuk tenor kredit motor bebek berapa taun?
MRT belum kelar, cicilan kredit dah kelar.
:big_blushing:

Kt sebagai masy kecil kan taunya keadaan riil sekarang. Yang udah memadai itu dimana?

Atau, dibalik deh, yang punya mimpi bagus, saat ini, riil aja, mau gak ninggalin mobilnya, beralih ke angkot dan naik kereta yang jelas jelas bisa lebih murah dibanding ongkos naik mobil sehari...? Berapa persen yang mau kalau disebar random ke 100 orang pilihan begini?

Kalau rahayat jelata macam ane, jelas naik kendr pribadi macam motor, karena penghematan yang sangat signifikan.
Kalau rahayat SM selain ane, jelas naik mobil, karena kenyamanan yang sangat signifikan.

Iya apa iya?
:big_biglaugh:
Kl kondisi skrg emang susah kayanya..transpotasi umumnya belum siap seluruhnya..
Menurut saya kronologisnya seharusnya begini
Angkutan umum siap ===> baru dipindahin
Jd perlu disiapkan dl angkutan umumnya..
MRT ini salah satunya..langkah yg baik..semoga lancar..
***** COOL VIDEOS !!! *****

http://www.globallabourrights.org/reports?id=0503

http://www.youtube.com/watch?v=V_BVB4kqp7Y

TOYOTA

The One You Ought To Avoid